Printing Plant

The Printing Plant project required engineering services for the brand-new facility, includes an ink blending system, steam, chilled water, cooling tower water, HVAC, plumbing, low-pressure air, vacuum, compressed-air systems, and dust collection system, The plant was built in phases, with the first phase being approximately 350,000 sq. ft., eventually reaching a total goal of two million sq. ft., over a 10-year period.

 

Industrial // Manufacturing