Central Tank Batteries
McKenzie County, North Dakota



1/2
Ross Group Engineering provided P&IDs for a multi-well site project in North Dakota. The project included a centrifugal compressor, oil truck loading stations, and water truck loading stations. Our engineering team also designed the facility to include three phase separators, horizontal heater treater vessels, and API-12f oil and water storage tanks.
The project was challenging as the client required a quick turn around and a cost effective design for the central tank batteries. Leveraging common design features from previous projects we completed for this client, our team met the client's short time frame and delivered a quality design.