top of page

Well Site Design
 Culberson County, Texas

Our engineering team worked with a new startup company to produce a wellsite design on an accelerated schedule. The deliverables included vessel and tank design drawings for fabrication, equipment data sheets, gathering system sizing, and a detailed BOM, as well as a plot plan, PFD, and P&ID. In addition, this project included electrical engineering for electrical, instrumentation, and controls design with cause-and-effect diagram and supervisory control and data acquisition (SCADA). 

​

Due to the quick turnaround time required, our team used their existing relationships with vessel fabricators and extensive well site design experience to obtain the long lead equipment in a timely manner, which allowed the project to be completed on time.

  • Grey LinkedIn Icon
  • Grey Facebook Icon
  • Instagram

© Copyright 2018 / The Ross Group Construction Corporation / All Rights Reserved

bottom of page